Due to the size of the boat and the constraints of the existing
yard, deck pictures taken while standing on the deck.
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
View of stern with 12 ft ladder leaning against it
View of bow thruster tube installation.
Looking aft at forepeak hatch.
Standing in cockpit looking back at Aft locker(s),
showing 6" riser, without lift off hatch covers.
Propane locker on right side
Typical lift off hatch cover.
(Propane locker bcover shown)
Starboard side view of cockpit without hatch covers
Propane tanks in fore ground.
Custom built holding tank awaiting installation
Approximately 65 gal capacity.
Holding tank installed and foamed in place
in head to starboard.
Custom battery boxes (Capacity to hold 4, T-105 golf cart batteries) awaiting final installation.
Final trimming of a typical bulkhead to accept deck.
Typical plywood core blank for a bulkheaad
Typical plywood core for a bulkhead after trimming to fit hull
Lead melting reclaim station
Reclaimed lead pigs awaiting installation to form ballast
Engine mock up (Includes front PTO, clutch and hydraulic pump)
Potable water tanks showing baffles and final coat of "tank resin", shown prior to installation of top of tanks.
Typical for all integral tanks
(12 fuel, 6 potable water, 1 hydraulic oil)
Gray water tank awaiting final installation.
Typical copper pipe manifolds for fuel & potable water tanks.
(Allows any tank to be pumped to any other like product tank)
Back to: THE STORY